lift line before pins or vice versa?

Posted: Sat Jun 20, 2015 4:27 pm
by archers
Page 21 of the ranger manual says the steps of the pipeline tasks must be done in order. The steps listed on page 20 have the attachment of the lift line coming right before pulling the pins. On page 22 second paragraph it says "after the lift line has been attached...pull two pins to simulate cutting the section of corroded pipeline. So which way does it need to be done? Lift line first makes more sense in the real world so the pipe would be ready to be lifted before it was cut. Anyway, see you soon!